On this page
The RESUME SCHEDULES
statement can be used to resume paused schedules:
When a schedule is resumed, the next_run
will be set to the next TIMESTAMP
that conforms to the schedule.
Required privileges
The following users can resume a schedule:
- Members of the
admin
role. By default, theroot
user belongs to theadmin
role. - Owners of a backup schedule, i.e., the user that created the backup schedule.
- Owners of a changefeed schedule, i.e., the user that created the changefeed schedule.
Synopsis
Parameters
Parameter | Description |
---|---|
selectclause |
A selection query that returns id (s) to resume. |
scheduleID |
The id of the schedule you want to resume, which can be found with SHOW SCHEDULES . |
Examples
Pause a schedule
> PAUSE SCHEDULE 589963390487363585;
PAUSE SCHEDULES 1
Resume a single schedule
> RESUME SCHEDULE 589963390487363585;
RESUME SCHEDULES 1
Resume multiple schedules
To resume multiple schedules, nest a SELECT
clause that retrieves id
(s) inside the RESUME SCHEDULES
statement:
> RESUME SCHEDULES WITH x AS (SHOW SCHEDULES) SELECT id FROM x WHERE label = 'schedule_database';
RESUME SCHEDULES 4
All schedules with the label schedule_database
are resumed.